How to plan a house extension
A good extension starts with a clear brief, not a floor area: what you need that the house doesn’t do now. Then the block’s rules (setbacks, site coverage, heritage) decide where it can go, and the approval path decides how long it takes.
Write the brief first
List what isn’t working
Too few bedrooms, no family room, a dark kitchen, no second bathroom.
List what you love
The light in one room, the garden, a period feature.
Think ten years ahead
Teenagers, ageing parents, working from home.
Set a budget with a buffer
Allow 10 to 20 percent for surprises.
Collect examples
Photos of homes and rooms you like.
Which direction?
| Option | Good for | Watch for |
|---|---|---|
| Rear extension | Kitchen and family room opening to the garden | Loses garden; overshadowing neighbours |
| Side extension | Wide blocks, extra bedroom or bathroom | Side setbacks; access down the side |
| Second storey | Small blocks; keeps the garden | Cost; stairs; living elsewhere during works |
| Attic or loft conversion | Steep roofs with height | Headroom; stairs; insulation |
| Converting a garage | Low-cost extra room | Losing parking; floor levels |
The rules for your block
Every block has planning controls set by the council and state: how far from the boundaries you must be (setbacks), how much of the block can be built on (site coverage), sometimes a maximum floor area (floor space ratio), a maximum height, and rules on overshadowing and overlooking neighbours. Heritage areas, flood zones and bushfire-prone land add their own. A planning certificate or the council’s planning maps show which apply.
Approval paths
- Exempt: some small works need no approval (rules vary by state).
- Complying development (NSW) or similar fast-track paths: a private certifier approves work that meets set standards, often in weeks.
- Development application or planning permit: council assesses the design, usually taking longer, with neighbours notified.
- Building approval or construction certificate: the technical check before building, in addition to planning.
Insurance and contracts
In most states, a builder doing residential work over a set value must provide home warranty insurance (called different names in different states, such as the Home Building Compensation Fund in NSW), and must use a written contract. Check the builder’s licence on your state’s register before signing.
Timeline
| Stage | Typical time |
|---|---|
| Brief, measure and concept design | 1 to 3 months |
| Approvals | 1 to 6 months, depending on the path |
| Builder quotes and contract | 1 to 2 months |
| Construction | 3 to 9 months for a single-storey extension |
Questions
Do I need council approval for an extension?
Usually yes, through a complying development path or a development application, but small works may be exempt. Check with your council.
How long does a house extension take?
Often 6 to 18 months from first sketch to finished, including design and approvals.
Is it cheaper to extend out or up?
Usually out, if the block has room; going up costs more but saves the garden.