How to plan a house extension

A good extension starts with a clear brief, not a floor area: what you need that the house doesn’t do now. Then the block’s rules (setbacks, site coverage, heritage) decide where it can go, and the approval path decides how long it takes.

By the Pncyl team · Updated 15 November 2026 · 3 min read

Write the brief first

  1. List what isn’t working

    Too few bedrooms, no family room, a dark kitchen, no second bathroom.

  2. List what you love

    The light in one room, the garden, a period feature.

  3. Think ten years ahead

    Teenagers, ageing parents, working from home.

  4. Set a budget with a buffer

    Allow 10 to 20 percent for surprises.

  5. Collect examples

    Photos of homes and rooms you like.

Which direction?

OptionGood forWatch for
Rear extensionKitchen and family room opening to the gardenLoses garden; overshadowing neighbours
Side extensionWide blocks, extra bedroom or bathroomSide setbacks; access down the side
Second storeySmall blocks; keeps the gardenCost; stairs; living elsewhere during works
Attic or loft conversionSteep roofs with heightHeadroom; stairs; insulation
Converting a garageLow-cost extra roomLosing parking; floor levels
BeforeExisting houseGarden With a rear extensionExisting houseExtensionGarden
The same block before (top) and with a rear extension adding a family room and kitchen (bottom).

The rules for your block

Every block has planning controls set by the council and state: how far from the boundaries you must be (setbacks), how much of the block can be built on (site coverage), sometimes a maximum floor area (floor space ratio), a maximum height, and rules on overshadowing and overlooking neighbours. Heritage areas, flood zones and bushfire-prone land add their own. A planning certificate or the council’s planning maps show which apply.

Approval paths

Insurance and contracts

In most states, a builder doing residential work over a set value must provide home warranty insurance (called different names in different states, such as the Home Building Compensation Fund in NSW), and must use a written contract. Check the builder’s licence on your state’s register before signing.

Timeline

StageTypical time
Brief, measure and concept design1 to 3 months
Approvals1 to 6 months, depending on the path
Builder quotes and contract1 to 2 months
Construction3 to 9 months for a single-storey extension

Questions

Do I need council approval for an extension?

Usually yes, through a complying development path or a development application, but small works may be exempt. Check with your council.

How long does a house extension take?

Often 6 to 18 months from first sketch to finished, including design and approvals.

Is it cheaper to extend out or up?

Usually out, if the block has room; going up costs more but saves the garden.