Changes worth making to a project home plan
Project home designs are a starting point. The changes that matter most are the ones that are cheap before the contract and expensive or impossible afterwards: ceiling height, window positions, wall moves, storage and power.
Make changes before the contract
Most volume builders let you change a design during the tender or pre-contract stage at standard prices. After the contract is signed, changes become post-contract variations, which usually carry an admin fee on top of the cost, and some changes are impossible once plans are approved or the slab is poured. Get every change into the contract drawings.
Changes buyers most often wish they had made
| Change | Why |
|---|---|
| Higher ceilings (2.55 to 2.7 m) in living areas | Rooms feel much larger; hard to change later |
| Wider hallways or doors | Easier furniture moving and future accessibility |
| Bigger or repositioned windows | Light, views and furniture placement |
| Extra power points and USB outlets | Cheap at frame stage, costly later |
| More storage | Linen, broom, under-stair, garage |
| Deeper garage | Fits today’s cars plus storage |
| Taller doors (2340 mm) with 2.7 m ceilings | Proportion and a sense of height |
| Reinforced bathroom walls | Grab rails later without retiling |
| Conduit to the roof and garage | Solar, batteries and car charging later |
| Larger alfresco or deck slab | Outdoor living is used more than expected |
Layout changes
- Flip the plan (mirror it) so living areas face north on your block. Usually free or cheap.
- Move a wall 30 to 60 cm to make a bedroom fit a queen with walking room.
- Swap a study and a bedroom to suit your family.
- Widen the kitchen aisle or shrink an island that is too big for the room.
- Remove a rarely used formal room and give the space to the family area.
What to leave
Finishes like paint, light fittings, tapware and even flooring are easier to change later. If the budget is tight, spend it on the things that are part of the structure (ceiling height, windows, walls, insulation) and upgrade finishes over time.
Questions to ask the builder
Is this change cheaper now or later?
And what is the post-contract variation fee?
Does it affect the approval?
Some changes need a new planning approval.
Is the display home showing upgrades?
Ask for a list of everything not in the standard inclusions.
What ceiling and door heights are standard?
Get them in writing per room.
Check the plan with your life in it
Before you ask for changes, test the standard plan with your real furniture, routines and family. The right changes come from noticing where your life doesn’t fit, such as no wall for the piano, a study with no window, or a laundry too far from the clothesline. See checking a builder’s floor plan.
Questions
What upgrades are worth it in a new build?
Ceiling height, windows, extra power points, storage, insulation and garage depth, which are hard to change later.
Can you change a project home floor plan?
Yes, usually before the contract at standard prices; afterwards, changes are variations with fees.
Is a 2.7 m ceiling worth it?
In living areas, most owners say yes.